[amsat-bb] Re: AO-51 update-running 2.05 Watts

Andrew Glasbrenner glasbrenner at mindspring.com
Wed Mar 3 08:12:49 PST 2010

John Geiger wrote:
> How long will it be on high power?
> 73s John AA5JG
Except for the occasion where we turn the repeater down to to 500mw to 
also collect telemetry via the digital downlink, AO-51 will remain with 
the high power downlink through the 10th, and whenever just the .92/.300 
repeater is on the rest of the month.

73, Drew KO4MA

More information about the AMSAT-BB mailing list